Technical Notes

Our Technical Library provides building professionals with total system solutions, specification clauses and CAD Drawings for download. Proctor can also provide general assistance with design detailing, building compliance codes and installation guidelines.

By providing Proctor with your project specifications, calculations can be quickly and accurately carried out to give R-Values, dew point and condensation risk analysis and the required insulation thicknesses.

Banner Tech Resources
Don’t believe everything you hear about micro-porous and monolithic membrane technologies.
Tech Note 09
 

Don’t believe everything you hear about micro-porous and monolithic membrane technologies.

Tech Note 08
NCC Compliance: Roofspace Ventilation and Timber Sheathing Boards
Tech Note 08
 

It is not technically incorrect to describe any timber sheathing board as being vapour permeable, but the question remains just how vapour permeable the different boards are. Many factors such as thickness, board type, number of layers of adhesive, timber type, adhesive used, moisture content and manufacturing homogeneity, all have an impact on the vapour permeability of a given product or manufacturing batch. It is important to have this tested value as an input for the hygrothermal modeling that is needed to prepare a Performance Solution.

Temperature and UV Resistance

Tech Note 07
 

This technical note presents key research from Freudenberg laboratories and field validations about the ProctorGeo HC8 and ProctorGeo EnkaVent represents a breakthrough in roofing underlayment technology. It is a three dimensional multi-use mat, made of continuous nylon filaments fused at their intersections. The product can be used in metal and ballasted roofing applications where spacing of the roof will provide the ventilation and drainage needed for a long service life.

Tech Note 6

Compliance & Comparison of Limited Combustability Sarking

Tech Note 06
 

We often asked to provide a vapour permeable sarking membrane that is non-combustible and vapour permeable. We are still not aware of such a product that exists in Australia.

Sarking products can be used in Type A or Type B wall constructions since NCC2019 not because they are “non-combustible” but because there is an exemption that permits their use wherever a non-combustible material is required. [NCC 2022 C2D10 or NCC 2019 C1.9]

Galvanic Corrosion

Tech Note 05
 

Galvanic Corrosion is a process of when two different metals of equal surface area are combined in the presence of an electrolyte (a fluid that conducts electricity). Hydrogen is absorbed at the cathode and a current flows, thus the less noble metal migrates into the solution (the ‘anode’ is attacked).

The Wall of Death

 
Tech Note 04

One of the most common enquiries we get asked is how to effectively insulate a single skin masonry wall or how to rectify one that has moisture or sinister odours emerging from behind the plasterboard lining. Since NCC 2016 Amendment 1 clarified the requirement for all elements of type A and type B wall construction to be non-combustible, including the insulation, we are seeing more drawings of what we have dubbed the “WALL OF DEATH.”

Combustibility of DCTech Vacuum Insulated Panels (VIP)

Tech Note 03
 

When something sounds too good to be true, it usually is. Since the NCC 2016 Amendment 1 clarified the requirement for all elements of type A and type B wall construction, including the insulation, to be non-combustible, DCTech have been receiving many enquiries about our market leading vacuum insulated panels (VIP).

Thermal Isolator & Section J0.5 Requirements

Tech Note 02
 

This technical note provides details of the Nvelope framing system, the Nvelope Thermal Gasket, its R-value and its relevance to the NCC 2019 Section J.

Aged R-Values

Tech Note 01

Changes in the Australian National Construction Code (NCC), 2019 with respect to Energy Efficiency (Section J), came into effect as of May 1st, 2020 after a transition period of one year. A more rigorous Section J lays out the requirements for the energy efficiency of new buildings and is the most significant change since Section J was introduced back in 2005.