Innovation built on experience

Masonry veneer (Brick veneer) – CW002a

Masonry veneer (Brick veneer) - CW002a

Products

Enviroseal ProctorWrap Commercial Wall (CW)
DCT Thermalcheck Super

Location

[Complete]

Material

Sarking Membrane:
Enviroseal ProctorWrap Commercial Wall (CW) breathable (vapour permeable) membrane or equivalent with vapour resistance of not more than 0.26MNs/g. Breather foil does not comply with this specification.

Insulation

Approved [glass/polyester] batts

Total R-Value

[Complete]

Support & Fixing

Tightly fit batts between studs. Extend to roof line in gable walls.

Fix breathable membrane to outside of frame with 150mm overlaps in accordance with AS4200.2 and the product user guide.

Flashings

Install flashings prior to installing sarking.

Vapour Barrier

Fix DCT Thermalcheck Super to underside of frame  [12.7mm PIR Insulation + [Size]mm Plasterboard]

A well installed vapour barrier may also be required in some cold climates and/or high humidity buildings. Proctor Group Australia recommends that a condensation risk analysis is undertaken to determine if required.

There are a large number of factors that need to be considered in assessing and managing condensation risk. Such factors include the local climate, building use, position, thickness and type of insulation, position and integrity of vapour barriers, and the degree and location of mechanical or passive ventilation. It is highly recommended that designers undertake a condensation risk analysis.